GEORGE BUSH BOULEVARD BRIDGE
Client
Palm Beach County Construction Management
Location
Delray Beach, FL
Engineer of Record
Bridge Design Associates, Inc.
Date of Completion
02/03/2011
Contract Bond
$1,035,805.24
At the existing two-lane bridge, SFI demoed the existing substructure pile caps and bridge railing; and, install new augercast piles, cast-in-place pile caps, bridge railing and approach slabs.