MARGINAL ROAD BRIDGE
Client
Palm Beach County Construction Management
Location
Royal Palm Beach, FL
Engineer of Record
Bridge Design Associates, Inc.
Date of Completion
06/30/2011
Contract Bond
$152,826.10
Along the west side of the existing two-lane bridge, SFI removed the existing rip rap structure and underground force main; and, installed new underground force main, revetment mats, precast concrete piles, helical anchors, and a cast-in-place concrete sidewalk extension with a barrier wall and FDOT chain link fence.