RIVERWALK AT HARBORSIDE
Client
Moss & Associates, Inc.
Location
Jupiter, FL
Engineer of Record
Coastal Systems International, Inc.
Date of Completion
10/14/2011
Contract Bond
$863,809.00
SFI demoed the existing precast concrete panel seawall and timber dock structures; and, installed a new steel sheet piling seawall with a cast-in-place concrete cap (approximately 1,065 LF) plus a new timber dock structure with timber railing and a fire line extension.