San Remo Bulkhead & Dock Replacement

Categories: /02 Jun 2020

Client
San Remo Bulkhead & Dock Replacement

Location
San Remo, Inc. A Condominium
2871 N Ocean Blvd., Boca Raton, FL 33

Owners Representative:

Kim Exsteen, Property Manager
San Remo Condo
2871 N. Ocean Blvd.
Boca Raton, Florida 33431
Office: (561) 750-7775
Fax: (561) 750-5018
Sanremo1@sanremoclub.com

Construction Dates:
START: May 2018
FINISH: January 2

Construction cost:
$3,195,405.00

Change Orders:
Yes (Phase II)

Project Status:
Near Completion

SFI Project Manager:
Mark Osburn

SFI Project Superintendent:
Darrin Miller (Phase I), Jorge Dominguez (Phase
II)

Replacement of approximately 1,760 LF of existing concrete pile & panel seawall with new Steel Sheet Pile (SSP), 14” x 14” x 40’ concrete batter pile at 4’ o.c. spacing, concrete cap with MMFX reinforcing rebar, fiber mesh concrete. Replacement of approximately 1,300 of existing wood dock with new structural timber framing and new composite decking. Existing wood dock piles were extracted and reused (at owners’ request). With the new dock/marina, the project required the installation of new Marine utilities; including new electrical service to new power pedestals, light bollards, light poles, water lines, new dedicated fire line, DDCV backflow preventer and new fire cabinets. A new addition to the marina was the installation of a composite decked floating dock with 12” solid composite dock piling and an aluminum access gangway. Clean fill was brought in to raise the grade to meet the new cap elevation for the owners’ final landscaping plan.